Year-Round SupplyFrozen Products
Frozen Mango
Upper Egypt · Egypt
Egyptian Zebda mango IQF — frozen at peak ripeness. Brix base fruit 14–18°, ≤ 8% glazing. Available year-round. HS 0811.90.
Best ForEU / GCC / North America
MOQ1 × FCL (40ft HC reefer at -18°C)
Lead Time7–21 days from confirmed PO
SupplyYear-Round
PositioningPremium
All Products
Frozen MangoGet Pricing
Buyer Reference Card
Technical Specifications
HS Code
0811.90.19
Soil / Origin
Upper Egypt — Aswan, Luxor
Varieties
Zebda (primary)
Quality Grade
Grade A
Calibration / Cuts
Chunks 20×20 mm / Slices 10–15 mm / Diced 10×10 mm
Packaging
10 kg Poly Bag in Master Carton (default) / 25 kg FIBC Bulk Bag
Container Capacity
20 MT per 40ft HC reefer at -18°C
Shelf Life
24 months at -18°C
Certifications
ISO 22000HACCPHalalEU Phytosanitary
Incoterms
FOB / CFR / CIF
Export Ports
Alexandria (EGALY) / Port Said (EGPSD)
Min. Order (MOQ)
1 × FCL (40ft HC reefer at -18°C)
Lead Time
7–21 days from confirmed PO
Payment Terms
LC at sight / T/T
Availability Calendar
Seasonality
Year-round supply — not subject to seasonal constraints. Available for order at any time.
Packaging Options
Export Packaging
Default
10kg10 kg IQF Poly Bag in Master Carton
Container Load
40' HC Reefer20 MT
20 pallets · 2000 units
At -18°C throughout transit
25 kg Bulk Bag (FIBC)
Container Load
40' HC Reefer20 MT
20 pallets · 800 units
Compliance
Certifications
ISO 22000
Food SafetyBureau Veritas
Valid until Jun 2026
HACCP
Food SafetyBureau Veritas
Valid until Jun 2026
Halal Certificate
ReligiousIslamic Food Authority
Valid until Dec 2026
EU Phytosanitary Certificate
PhytosanitaryEgyptian Ministry of Agriculture — PPIS
Shipment Compliance
Export Documentation
Standard Document Stack
Certificate of OriginIssued by Egyptian Chamber of Commerce
Phytosanitary CertificateMinistry of Agriculture — PPIS
Certificate of Analysis (CoA)Per lot — third-party lab tested
Health CertificateEgyptian Ministry of Health
EUR.1 Movement CertificateEU preferential tariff access
Bill of Lading / Air WaybillFull set of originals provided
Third-Party Inspection
SGSAvailable
Bureau VeritasAvailable
IntertekAvailable
Pre-shipment inspection available at buyer's request. Inspection certificates issued prior to vessel loading.
Documentation Turnaround
Full document set ready within 3–5 business days of vessel loading. Express processing available upon request.
Incoterms Offered
FOBCFRCIF
More Products
Related Products
Ready to Source?Get Pricing for